- All Products
- बदले
- Tindakan Cepat, Sakelar Batas
-
BZ-2RW82224-A2
In Stock
Min. : 1
Not available to buy on line? Want the lower wholesale price? Please sendRFQ, we will respond immediately
BZ-2RW82224-A2 Tech Specifications
SWITCH SNAP ACTION SPDT 15A 125V
Product Attribute | Attribute Value |
---|---|
Category | बदले / Tindakan Cepat, Sakelar Batas |
Manufacturer | Honeywell Sensing and Productivity Solutions |
Factory Lead Time | 3 Weeks |
Voltage Rating - DC | 125V |
Termination Style | Screw Terminal |
Series | BZ |
Pretravel | - |
Overtravel | 0.094" (2.4mm) |
Operating Temperature | -55°C ~ 121°C |
Operating Force | 170gf |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) |
Manufacturer Standard Lead Time | 14 Weeks |
Ingress Protection | - |
Electrical Life | - |
Current Rating | 15A (AC), 500mA (DC) |
Actuator Type | Lever, Roller |
Product Attribute | Attribute Value |
---|---|
Part Status | Active |
RoHS Status | ROHS3 Compliant |
Pbfree Code | yes |
Voltage Rating - AC | 125V |
Switch Function | On-Mom |
Release Force | 43gf |
Packaging | Bulk |
Other Names | 480-4649 BZ-2RW82224-A2-ND BZ2RW82224A2 |
Operating Position | 1.188" (30.2mm) |
Mounting Type | Chassis Mount |
Mechanical Life | 20,000,000 Cycles |
Lead Free Status / RoHS Status | Lead free / RoHS Compliant |
Features | - |
Differential Travel | 0.020" (0.5mm) |
Circuit | SPDT |
BZ-2RW82224-A2 Documents
Download datasheets and manufacturer documentation for BZ-2RW82224-A2
-
Datasheets
1.BZ-2RW82224-A2.pdf 2.BZ-2RW82224-A2.pdf
Others include "BZ-2R" parts
The following parts include 'BZ-2R'
Part # | Manufacturer | Category | Availability |
---|---|---|---|
BZ-2R | Honeywell Sensing and Productivity Solutions | Tindakan Cepat, Sakelar Batas | 2700 |
BZ-2R | Electro Corp (Honeywell Sensing and Productivity Solutions) | Tindakan Cepat, Sakelar Batas | 2506 |
BZ-2R-A2 | Honeywell Sensing and Productivity Solutions | Tindakan Cepat, Sakelar Batas | 2668 |
BZ-2R-A2 | Electro Corp (Honeywell Sensing and Productivity Solutions) | Tindakan Cepat, Sakelar Batas | 2532 |
BZ-2R-A22 | Honeywell Sensing and Productivity Solutions | Tindakan Cepat, Sakelar Batas | 0 |
BZ-2R-A22 | Electro Corp (Honeywell Sensing and Productivity Solutions) | Tindakan Cepat, Sakelar Batas | 2636 |
BZ-2R-D5 | Electro Corp (Honeywell Sensing and Productivity Solutions) | Tindakan Cepat, Sakelar Batas | 2527 |
BZ-2R-D5 | Honeywell Sensing and Productivity Solutions | Tindakan Cepat, Sakelar Batas | 2528 |
BZ-2R-P1 | Honeywell Sensing and Productivity Solutions | Tindakan Cepat, Sakelar Batas | 2607 |
BZ-2R-P1 | Electro Corp (Honeywell Sensing and Productivity Solutions) | Tindakan Cepat, Sakelar Batas | 2541 |
Customers also viewed
1206J2K03P30BCT
Knowles / Syfer
CAP CER 1206
ATS-11G-171-C2-R0
Advanced Thermal Solutions, Inc.
HEATSINK 30X30X20MM R-TAB T766
NMP1K2-KCKHHE-00
MEAN WELL
NMP CONFIGURABLE POWER SUPPLY 12
DF19L-14P-1H(56)
Hirose
CONN HEADER 14POS 1MM R/A SMD AU
Y1121127R000T9R
Vishay Foil Resistors
RES SMD 127OHM 0.01% 1/4W J LEAD
B82793C474N215
EPCOS
B82793C474N215 EPCOS (TDK)
CM6350-473
API Delevan
CMC 47UH 5A 2LN SMD
RT0805CRC0715R8L
Yageo
RES SMD 15.8 OHM 0.25% 1/8W 0805
ATS-12F-191-C2-R0
Advanced Thermal Solutions, Inc.
HEATSINK 45X45X30MM R-TAB T766
020811060
Bopla Enclosures
BOX FIBERGLASS GRY 4.33"LX2.95"W
Featured Manufacturers
Popular Categories
Sensor Debu
Antarmuka - UARTs...
Sensor Fotoelektrik
Aksesoris Penceta...
Pita Penyedot Tim...
Penglihatan Mesin...
Kit Kapasitor
PMIC - Regulator ...
Programmer Mandiri
PMIC - Regulator ...
Pengendali LED
BZ-2RW82224-A2 brand manufacturers: Honeywell Sensing and Productivity Solutions, Bonchip stock, BZ-2RW82224-A2 reference price. BZ-2RW82224-A2 parameters, BZ-2RW82224-A2 Datasheet PDF and pin diagram description download.You can use the BZ-2RW82224-A2 Pluggable Connectors, DSP Datesheet PDF, find BZ-2RW82224-A2 pin diagram and circuit diagram and usage method of function, BZ-2RW82224-A2 electronics tutorials.You can download from the Bonchip.
Payment Problem
The payment method can be chosen from the four methods shown below: TT in advance (bank transfer), Western Union, Credit card, PayPal.
Excellent Service
Professional Platform
Wide variety of products
Various payment methods
Original component only
Delivery at full speed
365 days quality assurance
Common Problem
If you have any questions, you can contact us quickly in the following ways:
Address : D1 6th floor,Lehui Center,Jihua Road 489 Longgang District, Shenzhen-518129, China
Shopping Guide
Shipping | Delivery Period | Packages will be arranged for delivery within 1-2 days from the date of all items arrive at our warehouse. In stock items can be shipped out within 24 hours. Delivery Time depends on Shipping Method and Delivery Destinations. |
Shipping Rate | Shipping rate is based on size, weight, destination of the package. Bonchip offers competitive shipping options through top carriers DHL, FedEx and UPS. We also offer shipping account services for customers who wish to be billed directly for shipping. | |
Shipping Methods | ||
Shipping Tracking | Once the components are delivered, the tracking number will be notified via email immediately. The tracking number also could be found in order history. | |
Returning | Returning | All returns should be made within 60 days of date of invoice and be accompanied by the original invoice number, certificate of guarantee card, parts picture and a brief explanation or test report of the reason for the return. Returns will not be accepted after 60 days. Returned merchandise must be in original packaging and in resalable condition. Parts returned due to customer error at time of quote or sale will not be accepted. Please contact customer service for a return authorization before return shipment. |
Ordering | How to Buy | Online and offline orders both are available. If you have any operation issue, please feel free to contact with our customer service. |
Payment | TT in advance (bank transfer), Western Union, Credit card, PayPal. Customer is responsible for shipping fee, bank charges, duties and taxes. |